The Experience of Mounting a Special Bridge Crane using Existing Building Structures of the Building Frame under the Conditions of the Existing Metallurgical Production
Abstract: The article gives the results of a survey of the technical condition of steel structures of the section of the converter shop of a metallurgical enterprise; the results of verification calculations of existing structures, with the introduction into calculation of the data obtained during the survey and the application of additional loads F = 30 ts and F = 70 ts. Technical solutions for the construction of additional building structures (mounting) have been given, which provide the possibility of applying loads F = 30 ts and F = 70 ts to existing building structures.
Keywords: inspection of technical condition, verification calculation, installation methods, installation structures.
Pages: 31-37.
For citation: Rozenwasser, G. P.; Ushakov, S. V.; Fedotov, A. S. [et al.]. The Experience of Mounting a Special Bridge Crane using Existing Building Structures of the Building Frame under the Conditions of the Existing Metallurgical Production. – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2017. – Issue 2017-6(128) Technology, organization, mechanization and geodetic support of construction. – Р. 31-37. – URL: https://donnasa.ru/publish_house/journals/vestnik/2017/2017-6(128)/st_05_rosenvasser_ushakov_fedotov_skorik.pdf (date of access: 19.11.2024). – ISSN 2519-2817.
Issue 2017-6 (128)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture