Technology of Work on Replacing of Ground Wire without Disconnecting the Overhead Power Line
Abstract: Based on the analysis of the domestic and foreign building experience of electrical networks there was developed the most promising way to replace a ground wire without removing the voltage from the overhead power line (OPL), which allows to reconstruct the mainline network with minimal cost. The advantage of this method is the possibility of carrying out work on the crossing OPL without disconnecting, over the railways and highways and other engineering constructions.
Keywords: coverhead power line, ground wire, technological chart, mainline networks.
Pages: 68-72.
For citation: Tanasoglo, A. V.; Bakayev, S. N.; Fomenko, S. A. [et al.]. Technology of Work on Replacing of Ground Wire without Disconnecting the Overhead Power Line. – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2018. – Issue 2018-3(131) Buildings and structures using new materials and technologies. – Р. 68-72. – URL: https://donnasa.ru/publish_house/journals/vestnik/2018/2018-3(131)/st_11_tanasoglo_bakaev_fomenko_bakaeva.pdf (date of access: 19.11.2024). – ISSN 2519-2817.
Issue 2018-3 (131)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture