Arrangement of Fixed Supports During Aboveground Installation of the Water Supply and Sewage Pipelines

A. S. PavlyuchenkoPJSC «YUZHNIIGIPROGAZ»N. I. GrigorenkoDonbas National Academy of Civil Engineering and Architecture
Abstract: The article deals with the issue of positioning of fixed supports in the above-ground laying of water supply and Sewerage pipelines. In view of the lack of recommendations for the design of water pipelines on the overpasses, a comparative calculation with above-ground heating mains was carried out. The data, which was obtained, show the need for further research to recommend the rules and regulations for the design of overhead pipelines of VC systems.

Keywords: aboveground installation of pipelines, racks, fixed supports, designing of water supply and sewage systems in special conditions.

Pages: 51-55.

PDF

For citation: Pavlyuchenko, A. S.; Grigorenko, N. I. Arrangement of Fixed Supports During Aboveground Installation of the Water Supply and Sewage Pipelines. – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2018. – Issue 2018-5(133) Engineering systems and man-made safety. – Р. 51-55. – URL: https://donnasa.ru/publish_house/journals/vestnik/2018/2018-5(133)/st_08_pavluchenko_grigorenko.pdf (date of access: 19.11.2024). – ISSN 2519-2817.


Issue Cover
Issue 2018-5 (133)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture