Ways to Reduce the Duration of the Construction of Frame-Monolithic Buildings

V. V. ТaranDonbas National Academy of Civil Engineering and ArchitectureD. V. AleinikDonbas National Academy of Civil Engineering and ArchitectureA. R. ShamrilyukDonbas National Academy of Civil Engineering and Architecture
Abstract: Reducing the duration of the construction of frame-monolithic buildings is currently an urgent task. To make the most technologically advanced decision, it is necessary to perform a comparison for each of the processes that make up the totality of work at the construction site. The main types of reinforcement of monolithic floors, types of formwork systems for the construction of a typical floor of buildings from monolithic reinforced concrete are considered, a set of works performed at the construction site for each of the constituent processes is presented. A comparison was made of the labor intensity in terms of the main type of supply of reinforcement products to the mounting horizon per 100 m2 of monolithic overlap. Comparison of labor intensity for the main types of formwork systems is presented. The choice of the most technologically advanced type of reinforcement and formwork systems will depend on the total labor intensity according to one of the criteria: the duration of reinforcement and formwork work, the duration of transport processes.

Keywords: reinforcement, formwork, monolithic overlap, labor intensity, duration.

Pages: 39-44.

PDF

For citation: Тaran, V. V.; Aleinik, D. V.; Shamrilyuk, A. R. Ways to Reduce the Duration of the Construction of Frame-Monolithic Buildings. – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2021. – Issue 2021-6(152) Technology, organization, mechanization and geodetic support of construction. – Р. 39-44. – URL: https://donnasa.ru/publish_house/journals/vestnik/2021/2021-6(152)/st_06_taran_aleynik_schamrilyuk.pdf (date of access: 19.11.2024). – ISSN 2519-2817.


Issue Cover
Issue 2021-6 (152)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture