Reconstruction of Existing Foundations by the Method of «Establishment of Foundations in Tamped Pits»


Yu. G. Kojhevnikova, A. I. Samoylichenko

State Autonomous Educational Institution of the Astrakhan Region of Higher Education «Astrakhan State University of Architecture and Civil Engineering», Astrakhan, Russia

Abstract: The demolition of objects included in the category of emergency involves the subsequent erection of buildings with a large number of floors on the vacated sites, and this, in turn, leads to the need for foundations capable of absorbing significant loads. One of the most commonly implemented methods is the construction of solid slab foundations in tamped pits. The main advantage of this method is the possibility of building a foundation in various soils. The paper considers the process of ramming, provides a classification of rammed foundations, as well as an example of a plan for a rammed foundation. It is substantiated that the reconstruction of existing foundations by the method of «developing foundations in tamped pits» in the future makes it possible to use existing pile elements, and with the introduction of additional short piles, to obtain a foundation that can absorb many times increased loads.

Keywords: foundation, tamped pit, ramming process.

Pages: 116-120.

PDF

Link for citation: Kojhevnikova, Yu. G.; Samoylichenko, A. I. Reconstruction of Existing Foundations by the Method of «Establishment of Foundations in Tamped Pits». – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2022. – Issue 2022-3(155) Buildings and structures using new materials and technologies. – Р. 116-120. – URL: https://donnasa.ru/publish_house/journals/vestnik/2022/2022-3(155)/st_19_kogevnikova_samoylichenko.pdf (date of access: 15.10.2024). (in Russian)


Issue Cover Issue 2022-3 (155)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture