Work Processes of a Crane-Manipulator with a Grab Bucket, Equipped with a Drive Screw Anchor

A. Yu. KocherginDonbas National Academy of Civil Engineering and ArchitectureA. V. PichahchiDonbas National Academy of Civil Engineering and Architecture
Abstract: The article presents an analysis of the effect of crane-manipulator parameters on the process of soil development by a grab bucket. The results of an experimental study show that a design with a driven screw anchor increases the development efficiency of 3–4 categories of soil, increases the digging depth, increases the bucket filling ratio and productivity. Comparing the pressure force developed by the CMU and the resistance of the soil to the introduction of the jaws of the grab bucket, we obtained the dependence of the maximum possible depth of the jaws, determined the influence of the parameters of the CMU on the process of the introduction of the jaws into the soil.

Keywords: grapple, CMU, pressure force, screw anchor.

Pages: 54-56.

PDF

For citation: Kochergin, A. Yu.; Pichahchi, A. V. Work Processes of a Crane-Manipulator with a Grab Bucket, Equipped with a Drive Screw Anchor. – Text : electronic. – In: Proceeding of the Donbas National Academy of Civil Engineering and Architecture. – 2019. – Issue 2019-4(138) Scientific and technical achievements of students of the construction and architectural industry. – Р. 54-56. – URL: https://donnasa.ru/publish_house/journals/vestnik/2019/2019-4(138)/st_10_kochergin_pichakhchi.pdf (date of access: 19.11.2024). – ISSN 2519-2817.


Issue Cover
Issue 2019-4 (138)
Journal: Proceeding of the Donbas National Academy of Civil Engineering and Architecture
Publish house: Donbas National Academy of Civil Engineering and Architecture